Quick answer
Web Design Davao’s office has a diesel backup generator with an automatic transfer switch and an enterprise-grade UPS on core network equipment, which reduce interruption during a power cut. They do not rule out a brief interruption to a live call, and it states no changeover time or runtime and claims no certifications.
- Ask any provider for the date and result of the last load test, and who owns fuel and servicing.
- Confirm whether individual devices such as workstations are covered by the UPS for your arrangement.
- Agree in advance who tells you about an outage, by which channel, how quickly, and which tasks wait.
Our Davao office has a diesel backup generator with an automatic transfer switch, designed to start and take over supply when mains power fails, and an enterprise-grade UPS supporting our core network equipment. These measures reduce interruption during a power cut. They do not guarantee that no interruption occurs, and this page says plainly what we do and do not claim.
What we have
- A diesel generator providing backup power in an outage.
- An automatic transfer switch, so the generator is brought in without someone having to start it by hand.
- An enterprise-grade UPS on core network equipment.
- Multiple fibre-delivered internet connections and enterprise-grade networking.
- A secure office with CCTV and controlled access.
What happens in an outage
When mains power drops, the transfer switch brings the generator in. Between loss of mains and generator supply there is a changeover. The UPS supports core network equipment during that period. Whether any individual device, such as a workstation, is covered by the UPS is something to confirm for your arrangement. A changeover can still cause a brief disruption to a live call or remote session. We do not state a changeover time.
What we do not claim
We do not state generator runtime or fuel duration here, and we do not claim certifications. Those depend on load and on conditions at the time, so ask us and we will answer in writing for your situation.
Readiness and maintenance
Backup power is only as good as its upkeep. Good practice, whoever the provider, includes a named owner for fuel and servicing, regular tests under load and a record of the last test. Ask any provider for the date and result of the last test. Where records exist for our office, we will provide them on request; none are published on this page.
Communication during an interruption
Agree in advance who tells you, by which channel and how quickly if an outage affects your team, and which tasks wait. Arrangements are agreed individually.
Other dependencies
Power is one of several dependencies. Internet connections, equipment, remote access tools and your own systems all matter. See our page on multiple fibre connections.
Questions to ask any provider
| Question | Our answer |
|---|---|
| Is there backup power for the office? | Diesel generator with automatic transfer switch |
| Is network equipment protected during changeover? | Enterprise-grade UPS on core network equipment |
| Who owns fuel and servicing? | Ask us |
| When was the last load test? | Ask us; we will answer in writing |
| What happens to live calls? | A brief interruption is possible; no seamless claim |
To discuss power resilience and continuity planning, get in touch with Web Design Davao. Enquiries are generally answered within four hours during support hours (Monday to Friday, business hours), with after-hours help for emergency requests.
Frequently asked questions
What backup power does the Davao office have?
A diesel generator with an automatic transfer switch, so the generator is brought in without someone starting it by hand, plus an enterprise-grade UPS on core network equipment. The office also has multiple fibre-delivered internet connections and enterprise-grade networking.
Will a power cut interrupt a live call?
It can. There is a changeover between loss of mains and generator supply, and the UPS supports core network equipment during that period. A brief disruption to a live call or remote session is possible, and no changeover time is stated.
Does the office state generator runtime or certifications?
Generator runtime and fuel duration are not stated because they depend on load and conditions at the time, and no certifications are claimed. Ask in writing for your situation. Where records of the last test exist, they are provided on request.